Sunday, November 13, 2011

First shop floor pour

This weekend we (Sara, Arick, Dan, Jessica, and myself) poured one third of the concrete floor for the shop: an area of ten feet by 23.5 feet, with an average thickness of about four and a half inches. I will post lots of photographs tomorrow. It took 50 loads with our little mixer to lay down three and one quarter cubic yards of homemade concrete.

No comments:

Post a Comment